Description
For sale are new luxury two and three bedroom apartments located in an urban villa with only 6 apartments. The new building is located in the center of the city of Makarska, where on the ground floor there is a large three-room apartment of 148 m2 with three bedrooms, two bathrooms and a large garden of 146 m2 with an outdoor grill and space for a summer kitchen, 2 two bedroom apartments of 76-77 m2 each located are on the first and second floor, with two bedrooms, two bathrooms and a large loggia of 17 m2, and on top a spacious penthouse of 158 m2 with three bedrooms, three bathrooms, a large living room with a built-in fireplace and a loggia of 44 m2 on which the possibility of installing a summer kitchen and hydro massage tub is structurally foreseen.
Although it is a smaller urban villa on 4 floors, it has an elevator.
All apartments, including the apartment on the ground floor, have an open view of the sea, which view can never be blocked because the property is located on sloping ground in the built-up part of the construction area, and everything is already defined in front, i.e. built.
The new building has 8 outdoor parking spaces that are sold with the apartment at a price of 15 000 Euros.
All apartments with an open concept interior design where the kitchen, living room and terrace form a unique space, that the view can be enjoyed from most of the apartment. All apartments with underfloor heating in bathrooms that come fully equipped with all sanitary facilities. All apartments are fully air-conditioned . Floor coverings in the bedrooms and in the living room, quality three-layer parquet of Croatian production in the rest of the apartment and on the terraces, Italian tiles of the first class. Glass fences on the terraces of all apartments. The entrance doors to all apartments are anti-burglary. Installations for TV – Internet in every room.
A great advantage of this villa is its quiet location in the very center of the city of Makarska. It is being built with high-quality materials, is currently under construction, and the completion of construction and occupancy is planned for the summer of 2025.